top of page
IMG_20240122_121615_edited.png

Projects

Here are some our past projects. They range from new turfing jobs, oversowing football fields and restoring established lawns.

300m2 Prep and Lay

Using a mini loader we carted in 9 cube of turf underlay and levelled it out. We then supplied and laid 300m2 of Kikuyu and Buffalo just in time for Christmas.

400m2 Sapphire Buffalo

This job we used a bobcat and removed 35t of soil and brought in roughly 30t of top soil. Once levelled we supplied and laid the turf and left the customer stoked with their new turf.

480m2 Kikuyu

This new build needed both top soil and turfing done. We used a mini loader with some tight access down into the backyard to cart in 24ton. We then supplied and laid roughly 450m2 of Kikuyu and 30m2 of Sapphire Buffalo. 

2022 NSW Koori Knockout

We had a great opportunity to assist in the preparation of the fields used for the 2022 Koori Knockout. We did a few aerations then oversowed all the playing surfaces with Perennial Ryegrass. We then fertilised the fields a couple of times in the build up to the knockout. You can see in the first photo the visual of the main field during the knockouts tv coverage.

bottom of page